Installation & Erection of 2 × 1,500 MT Grain Silos
/ Grain Storage Case Study

Installation & Erection of 2 × 1,500 MT Grain Silos

Engineering and erection of a dual-silo storage installation designed to strengthen raw-material storage capacity, handling flow, and site logistics for industrial grain operations.

PhilippinesSilo Installation & Erection
/ 01
2 × 1,500 MT
Storage Capacity
/ 02
Commercial Grain Storage
Project Type
/ 03
Silo shells, support systems and foundations
Structural Components
/ Executive Summary

A dual 1,500 MT silo installation strengthening raw-material storage and handling resilience.

This project expanded commercial grain storage capacity through the erection of two large silos, coordinated with foundations, handling interfaces, access, and site logistics.

/ 01
2 × 1,500 MT
Storage Capacity
/ 02
Commercial Grain Storage
Project Type
/ 03
Silo shells, support systems and foundations
Structural Components
/ Engineering Narrative

From storage requirement to integrated silo assets.

/ The Challenge

Adding major storage capacity while coordinating civil, shell erection, and handling interfaces.

Silo work requires exact sequencing: foundation readiness, shell assembly, lifting plans, structural integrity checks, and connection to upstream and downstream grain movement systems.

/ The Solution

A controlled erection plan for storage reliability and site integration.

MEC aligned foundation interfaces, silo shell works, mechanical handling routes, and access planning to deliver storage capacity that supports dependable raw-material operations.

/ The Results

Operationally ready, delivered with engineering confidence.

The completed silos expanded on-site storage resilience, improved procurement flexibility, and created a more dependable grain-handling backbone for downstream operations.

/ Engineering Disciplines

Coordinated as one integrated delivery.

The scope included storage-system engineering, civil interfaces, mechanical handling coordination, and field erection controls for a dual-silo configuration.

Engineering Design

/ D01

Installation

/ D02

Mechanical Works

/ D03

Civil Works

/ D04
/ Execution Timeline

A grain-storage execution path from foundations to material-flow readiness.

  1. / Phase 01

    Storage Planning

    Capacity targets, site interfaces, foundation readiness, and handling routes were confirmed.

  2. / Phase 02

    Foundation & Access

    Civil interfaces, anchor points, equipment access, and safe work zones were prepared.

  3. / Phase 03

    Silo Erection

    Shell sections, support components, platforms, and structural assemblies were installed.

  4. / Phase 04

    Handling Integration

    Conveying connections, access checks, final inspection, and operations turnover were completed.

“MEC delivered an engineering program we could trust end-to-end — disciplined planning, accountable execution, a commissioned asset that performs as designed.”
/ Industry Partner · Grain Silos
/ Related Projects

More from the grain silos portfolio.

Expanding grain storage capacity? MEC can engineer the silo execution path.